1. Desander installation:
a.Desander installation should be as near to wellhead as possible.
b. Connect flow line as straight as possible with 3FIG1502 main sand diameter of the union, with a hammer smashing tightly.

2. Desander slide valve operation
a. Open the filter cartridge
Pressure on the filter cylinder filled with venting system
Open inlet valve firstly
And then open outlet valve
b. To close filter cartridge
Close up outlet valve firstly
And then close up inlet valve
With the venting system vent filter cartridge

3. Desander wall inspection
Before operating desander, suggest that measure the wall thickness of the device and line at the key part of the process as a raw date.
During operating desander, measure wall thickness regularly, and then comparing with previous date to find the extent of erosion.

4. Venting system of desander inspection
Reduce some damage caused by valve operation
Safe pressure reduction
Gas well without noise
If the vent to the torch, non aerosol generating.
yellow color desander

Latest News

Stay updated with the latest developments in solids control technology and industry trends

AIPU Vacuum Degasser Successfully Validated by Clients

AIPU Vacuum Degasser Successfully Validated by Clients

In mid-December, the new batch of AIPU vacuum degasser was v...

Read More
Working principle of drilling mud agitator

Working principle of drilling mud agitator

Mud agitators are key components of drilling fluid solids co...

Read More
High-Efficiency Shale Shaker for Oilfield Drilling Fluids

High-Efficiency Shale Shaker for Oilfield Drilling Fluids

In modern oilfield operations, efficient solids control is e...

Read More